Test Pit Excavation and Site Investigation Support

Test Pit Excavation and Site Investigation Support

Enviropacific was engaged to undertake preliminary site investigation works to support future remediation planning. The scope included removal and reinstatement of site fencing to enable access, grass slashing of the work area, non-destructive digging (NDD) to locate and confirm the alignment of a Telstra optic fibre cable, and excavation of twenty test pits for soil sampling and material assessment by an environmental consultant.

Given the presence of critical underground services, a staged approach was implemented. The Telstra optic fibre cable was identified, and potholes were excavated along its alignment to ensure safe clearance distances were maintained throughout all excavation works.

The optic fibre cable was safely located, surveyed and protected, with an exclusion zone implemented to prevent excavation within three metres of the service. All test pits were excavated, sampled and subsequently backfilled, with the site fencing reinstated. The data collected during the investigation will inform the development of a Remediation Action Plan for future site works.

Summary
• Site access established, including temporary fencing and vegetation management
• Telstra optic fibre cable located and protected using non-destructive digging
• Excavation and backfilling of twenty test pits for environmental investigation
• Site reinstated on completion to maintain safety and operational readiness

cLIENT
ERM
tIMEFRAME
1 Week
lOCATION
ACT