Successful Remediation of a Former Dry Cleaning Site in Victoria

Successful Remediation of a Former Dry Cleaning Site in Victoria

We were engaged by ARC Environmental to decommission and remediate a former dry-cleaning site in Victoria.

The primary contaminant of concern, Tetrachloroethylene (PCE), was identified in soil and groundwater within the site boundary and surrounding areas, with vapour contamination being detected in a neighbouring apartment building.

Our team developed a comprehensive Health and Hygiene Management Plan that utilised a Traffic Light Activation System to establish guidelines for specific PPE requirements. To manage vapour contamination, a negative air pressure system was implemented in the apartment building, incorporating extraction fans and carbon filters, with continuous background atmospheric monitoring throughout the project.

Under these stringent controls, the dry-cleaning interior infrastructure, gantries, and mezzanine floor were carefully dismantled and removed. Following the interior demolition, hardstands in three specific areas of concern were removed, and impacted soils were excavated, stockpiled, and transported off-site for thermal treatment at SOLVE, our resource recovery facility in Altona.

During excavation, three underground petroleum storage tanks and one triple interceptor pit were unexpectedly discovered, requiring decommissioning and removal. The primary source of contamination was identified as a large leaking trade waste pit, which had allowed contaminant vapours to travel through voids beneath the concrete hardstand into the neighbouring apartment complex.

Structural engineers were consulted to ensure the safe removal of the pit without compromising the building’s structural integrity. Approximately half of the pit was precisely deconstructed, and a significant volume of surrounding contamination was removed.

Enviropacific collaborated closely with ARC Environmental to validate all excavation surfaces before backfilling the areas with crushed rock sourced from a local quarry.

Summary

  • 315 tonne of Cat C PCE impacted soils excavated and loaded off site for thermal desorption treatment at SOLVE.
  • Creating a negative air pressure system using extraction fans with continuous background atmospheric monitoring.
  • Careful deconstruction and removal of interior steel structures, gantries and a mezzanine floor.
  • Decommissioning and removal of UPSS infrastructure.
  • Validation sampling and backfill.
  • 3400 litres of flammable liquid waste extracted and removed from site.
  • 8020 litres of diesel and oily waters extracted and removed from site.
cLIENT
ARC Environmental
tIMEFRAME
Not Available
lOCATION
Victoria