Demolition and Contaminated Soil Remediation at the ARTC Goulburn Depot

Demolition and Contaminated Soil Remediation at the ARTC Goulburn Depot

Enviropacific was engaged by the Australian Rail Track Corporation (ARTC) to undertake the demolition and remediation of several disused structures at the Goulburn rail depot. This included the removal of Moran’s Shed, Joey’s Shed, and the Annex Store. In addition to the structural works, the project scope expanded to include the excavation and removal of contaminated soils from the Moran’s Shed footprint.

The access to the site was highly restricted, with entry limited to a narrow passage within the rail corridor. This required meticulous planning and coordination with all stakeholders to ensure all activities were carried out safely, efficiently, and in compliance with the safety standards.

Despite logistical constraints and the technical complexity of the site, the project was completed safely, on time, and in line with environmental and regulatory obligations.

Summary

  • Removal of hazardous building materials including asbestos containing roof materials
  • Removal and safe disposal of lead acid batteries
  • Demolition of structures and removal of railway lines
  • Excavation and removal of asbestos contaminated soils (classified as restricted) and
    general solid waste
  • Recycling of recovered steel materials
  • Validation of excavations through a third-party environmental consultant
cLIENT
Australian Rail Track Corporation (ARTC)
tIMEFRAME
Not Available
lOCATION
NSW