Delivering Critical Civil Works in a Former Landfill Environment

Delivering Critical Civil Works in a Former Landfill Environment

Our team successfully delivered critical civil infrastructure works at Talobilla Park, Kippa Ring, within a former municipal landfill environment containing asbestos-containing material (ACM) and PFAS-impacted groundwater. Delivered as part of Moreton Bay Council’s broader facilities upgrade program, the project required the integration of conventional civil construction with specialist contaminated land management.

Working within challenging site conditions, our team excavated and managed ACM-impacted landfill materials, removed approximately 2,000 tonnes of contaminated soil and 283 kL of PFAS-contaminated groundwater, and constructed approximately 190 metres of service trenches through the landfill interface. To maintain environmental controls and protect long-term asset integrity, the trenches incorporated approximately 1,600 m² of 2 mm HDPE liner and 7,500 kg of hand-formed bentonite plugs, creating low-permeability barriers within the landfill environment.

The project demanded careful coordination of excavation activities, contamination controls, waste classification and tracking, groundwater management, HDPE liner installation, bentonite plug construction and trench reinstatement. Specialist containment measures were integrated into the construction sequence to ensure environmental risks were effectively managed while maintaining project progress.

A key project outcome was the successful delivery of infrastructure works while preserving the integrity of the landfill interface and minimising the potential for service trenches to act as pathways for landfill gas migration. The project demonstrated our team’s capability to combine civil construction, contaminated land remediation, environmental risk management and complex waste logistics to safely deliver infrastructure within highly constrained former landfill conditions.

This project highlights the benefits of incorporating contaminated land expertise early in civil construction planning and delivery, enabling effective management of environmental risks while supporting successful construction outcomes.

Summary

  • Removed approximately 2,000 tonnes of contaminated soil
  • Treated 283 kL of PFAS-contaminated groundwater
  • Constructed approximately 190 metres of service trenches

cLIENT
Apollo Property Group
tIMEFRAME
6 Months
lOCATION
Kippa Ring, QLD