
Our team has delivered a 2.4 MLD ultra-pure water treatment plant, housed across three 40-foot containers to our client in QLD. Designed and built at our Perth manufacturing facility this advanced system integrates Double Pass Reverse Osmosis and Electro Deionization (EDI) and shall supply ultra-pure feedwater at a Green Hydrogen Electrolyser test facility.
Our team has been involved since the conceptual design phase (2021- 2023) of the project, incorporating engineering innovations, including minimising process water-cooling requirements, resulting in energy savings for the client.

The final design resulted in a 3 x 40 foot containerised solution incorporating pre-treatment, Double Pass Reverse Osmosis (RO) and Electro Deionisation (EDI) technologies along with ancillary systems including chemical dosing and automated Clean in Place CIP system.
The automated treatment plant control system (written by our in-house team) is supported by both local HMI and remote access. The system was designed with maintenance simplicity in mind and has built-in scalability to accommodate future capacity requirements, ensuring long-term operational adaptability.
Summary
- Delivery of a robust and quality driven ultra-pure water treatment solution to the client
- Incorporation of our innovative design to lower future OPEX while facilitating future capacity requirements, ensuring long-term operational adaptability.
- Provide lifecycle service and support to all builds.






